Completed Projects and Studies

Completed Projects and Studies

Completed Projects/Studies

This page contains the projects/studies to which the Yampa-White-Green Basin Roundtable has granted WSRF funds to and has been completed.  Use the map to find out the basic information or for a more detailed description of the project and its reports please use list below the map.

Page was last updated on 8/6/2024

Maybell Ditch Project

Maybell Ditch Company 

Supported the addition of a waste gate to the Maybell Canal

Approved: November, 2016

Basin Ask: $45,675

Little Snake River Basin Interstate Conflict Reduction

Pothook Water Conservancy District

Interstate Conflict Reduction and Consumptive Use Accountability in the Little Snake River Basin

Approved: March 2022

Basin Ask: $10,000      State Ask: $16,100

Martin Springs Irrigation and Storage Improvements

Deborah Martin

Improved a small reservoir and irrigation structures

Approved: September, 2019

Basin Ask: $7,462

Advancing K-12 Water Education in Western Colorado

John McConnell Math and Science Center
 
Fabrication of a water center at the John McConnell Math and Science Center.  Asked for WSRF funds from all western round tables.
 
Approved: September, 2017
 
Basin Ask: $15,000                State Ask: $33,333

White River Storage

Rio Blanco Water Conservancy District 

Further study of the Wolf Creek Reservoir

Approved: March, 2017

Basin Ask: $85,000          State Ask: $82,888

 

Walker Ditch Headgate Replacement

Upper Walker Ditch Company

Fund a new headgate structure on the Walker Ditch

Approved: May, 2019

Basin Ask: $62,222

Yampa-White-Green Education and Outreach

Community Agriculture Alliance

A three year grant to CAA to provide education and outreach in the Yampa-White-Green Basin on behave of the YWG BRT.

Awarded: May, 2016

Basin Ask: $150,000

Crosho Lake and Reservoir - Simon#1 Dam Outlet Replacement

Crosho Lake Corporation 

Project to replace the outlet of Simon #1 Dam

Approved: March, 2016

Basin Ask: $30,000         State Ask: $108,380

Characterization of Streamflow, Suspended Sediment and Nutrients in the Upper Yampa River Basin

Upper Yampa Water Conservancy District

Study on the upper Yampa above Stagecoach Reservoir on streamflow, suspended sediment and nutrients conducted by the USGS.

Approved: January, 2019

Basin Ask: $77,424

Yampa River Health Assessment and Streamflow Management Plan

City of Steamboat Springs

A study of the Yampa River health from Stagecoach Reservoir to the wastewater treatment plant and development of streamflow management plan.

Approved: July, 2016
 
Basin Ask: $21,000

Improvement of Lysimeter operations and consumptive use quantification in high-altitude, irrigated meadows in the Yampa/White Basin

Colorado State University 
Two grants awarded for the improvement of lysimeter operation in the Yampa Valley.  A new weather station was installed and new buck lysimeters where installed.  Operations and data collections was funded through 2019.  
 
Approved: Nov 2010                                                      May, 2016
 
Basin Ask: $10,000  State Ask: $ 10,978                     Basin Ask: $11,304   State Ask: $11,304

White River Algae Research Project

White River Conservation District

Three year study on what could be causing the algae blooms in the White River

Approved: November, 2018        Completed:  December, 2021

Basin Ask: $99,000

Yampa River Forests Restoration and Temperature Mitigation Project

City of Steamboat Springs

In partnership of the Yampa Valley Sustainability Counsel three year project to develop a nursery and plant trees along the Yampa to reduce water temperature

Approved: January, 2019

Basin Ask: $25,000

YWG BRT Application                               Report

Yampatika "Yampa White Green Rivers K-12 Curriculum"

Yampatika

Three year grant to develop and provide water education curriculum to the school districts within the Yampa-White-Green basin.

Approved: November, 2019  Completed June 2023

Basin Ask: $99,053

 

Yampatika "Yampa White Green Rivers K-12 Curriculum"

Yampatika will develop and implement a K-12 focused youth water education program for the Yampa/White/Green (YWG) Basin Roundtable. This project will include the development of curriculum based on Next Generation Science Standards (NGSS) state standards, a comprehensive evaluation system that measures both quantitative and qualitative success and professional development opportunities for educators related to water education. Youth water education programs will focus on increasing general water education, which includes highlighting the importance of water in the Basin to all relevant stakeholders including agriculture, municipalities, recreation, businesses, community members, and the environment. These education programs will be a valuable opportunity to highlight the Colorado Water Plan, the Basin Implementation Plan, and the critical role of the YWG Basin Roundtable to address the consumptive and non-consumptive water needs across the Basin. Evaluation components will be created for school-based programs and professional development opportunities to ensure short and long-term success of water education programs. WSRF funds will be used over a three-year period to accomplish these educational objectives.

Approved: November, 2019

Basin Ask: $99,053

 YWG BRT Application                                       Reports

Pothook Water Conservancy District "Interstate Conflict Reduction and Consumptive Use Accountability in the Little Snake River Basin"

The Pothook Water Conservancy District (PWCD) will purchase one portable stream flow meter for variable location flow metering and purchase/install a totalizing telemetric measurement station at the Trowel Ditch Diversion in NW Colorado, the furthest downstream diversion of the Savery-Little Snake River Water Conservancy District. This accurate, real-time discharge measurement with remote data transmission will increase the administrative efficiency and efficacy of water deliveries throughout the Little Snake River Basin, help to provide stable and sustained water appropriations to Colorado water rights, and reduce interstate water conflicts in the Little Snake River Basin between Colorado and Wyoming water users while contributing to the long-term analysis of the hydrologic pathways from the consumptive and non-consumptive use of appropriated water in the Little Snake River Basin.

Approved: March 2022

Basin Ask: $10,000         State Ask: $16,100  

Application                         Reports

Deborah Martin "Martin Springs Irrigation and Storage Improvement Project "

The Martin Springs Irrigation project will make improvements to an existing storage pond and point of diversion. They will dredge an existing pond to remove accumulated sediment. This will provide capacity for the absolute storage right of 3.5 acre-feet. They will install a stainless steel head gate and 12” HDPE pipe diversion structure, and construct approximately 600 feet of lateral swales for 11.42 irrigated acres.

Approved: September, 2019

Basin Ask: $7,462

Application                         Reports

Walker Ditch Company "Walker Ditch Headgate Replacement"

The project replaces a major diversion headgate and flood control structure serving the Walker Ditch located on the Yampa River, three miles east of Hayden Colorado. The project headgate was constructed in approximately 1940 after the river migrated north away from the original 1890 headgate location. The 1940 river migration required an extension of the ditch through the old channel and new headgate structure on the new river channel.

Approved: May, 2019 

Completed March, 2021

Basin Ask: $62,222

Application                           Reports

City of Steamboat Springs "Yampa River Forest Restoration and Temperature Mitigation Project"

The 2018 Yampa River Health Assessment and Streamflow Management Plan (aka The Stream Management Plan) found that the riparian forest is degraded on the reach of the Yampa River above the Chuck Lewis State Wildlife Area, through town and to the Wastewater Treatment Plant and that improving the quality of the vegetation, particularly the shading canopy cover, will lead to improvements in stream temperature and water quality on the Yampa River. By restoring the river forest, this 3-year project that was identified as a top priority action item in the Stream Management Plan, will also help to improve aquatic and terrestrial habitat and to stabilize the river channel thus making it more resilient to floods, droughts, or human impacts. The City intends to partner with the Yampa Valley Sustainability Council’s (YVSC) Re-Tree program to restore the riparian forest through strategic plantings of willows, alders, cottonwoods and other native river plant species on Public Open Space parcels and other prioritized locations. This project will connect community members, especially youth, to the river through this locally established volunteer tree-planting program. The WSRF funds will be used to design and prioritize restoration projects; to secure an adequate supply of trees and shrubs that are purchased and/or harvested locally; to construct a seasonal riparian plant nursery, if deemed necessary, to coordinate plantings on the prioritized areas, and to provide long-term care and protection for the seedlings.

Approved: January, 2019 

Completed January, 2022

Basin Ask: $25,000

YWG Application                                      Reports

White River Conservation District "White River Algae Research Project"

The White River Algae research project Scope of Work (SOW) will be conducted by USGS to improve the understanding of why an excessive amount of benthic algae is occurring in the White River over the past 3 – 5 years. A better understanding based on science is expected to lead to the development of mitigation strategies for decreasing benthic algae in the White River.

Approved: November, 2018

Completed December, 2021

Basin Ask: $99,000

YWG Application                                              Reports                       Website

Friends of the Yampa "Yampa River Leafy Spurge Project"

The Yampa River Leafy Spurge Project (YRLSP) engages private land owners, federal, state and local government agencies, educational, environmental and recreation organizations and interested individuals, who share a concern for the economic and ecological future of the Yampa Valley. We are working together to establish an effective program of integrated management for leafy spurge an emerging threat to our regional agricultural economy and riparian watershed health.

Approved: September, 2018 

Completed December, 2021

Basin Ask: $89,000

YWG Application                                         Reports

John McConnell Math and Science Center "Advancing K-12 Water Education in Western Colorado"

The John McConnell Math and Science Center located downtown Grand Junction on the Colorado Mesa University campus.

This grant will help construct a 400 sq ft hydrology exhibit that includes an interactive water table with multiple hands on tanks that demonstrate principles of hydrology, river dynamics, water cycles, agriculture and municipal uses, conservation, and water law for kids and parents of all ages to enjoy and learn.

Approved: September, 2017
Completed January, 2019
 
Basin Ask: $15,000
 
State Ask: $33,333
 
Application                                                 Report
 
Community Agriculture Alliance " Yampa-White-Green Education and Outreach"

This grant will help develop and implement water education and outreach in the Basin. This is a 3-Year Program of Collateral Dissemination, Media Networking, Forums and Workshops on behave of the Yampa White Green Basin Roundtable and the Public Education Patriation Outreach committee.

Awarded: May, 2016

Completed June, 2021

Basin Ask: $150,000

Application                               Reports

Crosho Lake Corporation "Crosho Lake and Reservoir -Simon #1 Dam Outlet Replacement"

Project to replace the outlet of Simon # 1 Dam on Crosho lake.

Approved: March, 2016

Completed December, 2019

Basin Ask: $30,000

State Ask: $108,380

Reports

Maybell Irrigation District "Maybell Ditch Improvement Project"

The Maybell Ditch Improvement Project installed an automated waste gate and a measuring flume in the Maybell Ditch. In addition, the District permanently stabilized a hillside that had been reducing irrigation efficiency and producing sediment loads into the Yampa River for many years. Gates were also installed in strategic locations on the ditch to improve water management, helping to manage water flows and reduce tail water.

Approved: November, 2016

Completed February, 2018 

Basin Ask: $45,675

Application                               Report

Yampa White Green Roundtable Basin Implementation Plan Modeling Phase 3 Final Report

 

Completed, 2018

Report

Upper Yampa Water Conservancy District "Characterization of Streamflow, Suspended Sediment and Nutrients in the Upper Yampa River Basin"

The project objectives include obtaining a better understanding of the causes of increased prolific algal occurrences in the Upper Yampa River watershed. Applying stream flow data to the past eight years of USGS water quality data collected at sampling sites in the basin will allow the USGS to create accurate nutrient and sediment loading models. This analysis is designed to provide new data and subsequent understanding of the transport and fate of nutrients and sediment as well as seasonal fluctuations at sites throughout the watershed. As part of this analysis, a comprehensive evaluation of potential loading sources will be undertaken. Water suppliers, wastewater treatment operators, recreational users, and the citizenry at large will benefit from this analysis. Water managers, including those in the agriculture industry, will be better able to make informed decisions as the dynamics of these important constituents are better  understood. The full USGS study proposal is available upon request.

Approved: January, 2019

Completed: June, 2021

Basin Ask: $77,424

Application                                         Reports                  Link to the USGS Report

Rio Blanco Water Conservancy District "White River Storage Project - Phase 2"

In March of 2015, the Rio Blanco Water Conservancy District completed an initial feasibility study to identify potential water storage sites in the White River Basin. The study evaluated 25 potential storage sites along the White River and concluded that a new reservoir, located near the confluence of the White River and Wolf Creek, would provide a very efficient, cost effective, multipurpose water project for northwestern Colorado The purpose of  additional White River water storage is to conserve and put to beneficial use some of the approximately 500,000 acre-feet of unused water that flows out of Colorado from the White River each year. The Rio Blanco Water Conservancy District continues to face a serious water crisis because it’s Kenney Reservoir, which originally provided 13,800 acre-feet of storage, is silting in at an average rate of more than 300 acre-feet per year. The annual loss of water storage in Kenney Reservoir reduces recreation use in the reservoir each year and significantly increases the risk to the Town of Rangely’s water supply in times of droughts. Storing a portion of the water that flows out of Colorado from the White River each year will provide significant benefits to endangered fish; provide additional water for municipal, agricultural, and industrial; provide water quality benefits; and meet future demands for a variety of recreation activities in northwest Colorado. The Phase 1 study also documented that that a new Wolf Creek Reservoir would produce additional annual tax revenues of nearly $1.4 million to local economies and the State of Colorado.

Approved: March, 2017

Basin Ask: $85,000

State Ask: $82,888

Application                           Reports 

Steamboat Springs " Yampa River Health Assessment and Streamflow Management Plan"

The Yampa River Health Assessment and Streamflow Management Plan identifies a long-term strategy for protecting and improving the health and resiliency of the Yampa River near Steamboat Springs.  This project develops a Stream Management Plan that supports a resilient and healthy river and appropriate river recreation along a highly used reach of the Yampa River from the Chuck Lewis State Wildlife Area to the Steamboat Springs Wastewater Treatment Plant.

Approved: July, 2016
Completed: July 2018
 
Basin Ask: $21,000
 
Reports                  External Website

 

Colorado State University " Improvement of Lysimeter operations and consumptive use quantification in high-altitude, irrigated meadows in the Yampa/White BAsin"

This project/study will focus on efforts to improve lysimeter operation in the Yampa Basin.  New bucket type lysimeters and a full automated weather station on the Carpenter Ranch.  The bucket new lysimeters are weighing lysimeters instead of compensating lysimeters.  The new lysimeters will provide quantitative assessment of irrigated hay meadow consumptive use and its relation to local weather conditions.  A second grant was awarded for the continued operation of the site.

Approved: Nov 2010                                                      May, 2016
 
Basin Ask: $10,000  State Ask: $ 10,978                     Basin Ask: $11,304   State Ask: $11,304
 
Application                   Reports
The Colorado River Water Conservation District " Colorado River Development and Curtailment Risk Study I, II, III"

At the December 14, 2014 joint meeting of the four West Slope Roundtables, participants
requested information to facilitate intra-basin discussion of demand management, should low
levels at Lake Powell require that tool, as well as discussion of potential future development of
West Slope Colorado River system supplies. In response, the Colorado River District and
Southwestern Water Conservation District proposed Phase I of the Colorado River Risk Study.
Each district and each Roundtable shared in the costs. This continued into a Phase II, and at the
April 25 joint meeting, the four West Slope Roundtables will contemplate the need for a Phase
III and what questions it would tackle.

 

Approved: March, 2016          March, 2017

Basin Ask: $8,000                    $10,000

Reports 

Yampa White Green Basin Roundtable "Basin Implementation Plan"

The YWG BRT identified eight primary basin goals. The principal objective underlying all of the goals is the maintenance and protection of historical water use in the YWG Basin as well as the protection of water supplies for future in-basin demands. The YWG Basin goals ultimately seek to promote a healthy and diversified economy long into the future. By maintaining historical water use, residents in the YWG Basin will continue to use the YWG Basin’s natural resources sustainability which will consequently maintain a balanced and diverse economic base. To effectively address future uncertainties, the YWG BRT supports the use of a scenario planning approach for regional and statewide water supply planning that recognizes that both wet and dry periods will occur in the future.

Approved: 2013 to 2014

Completed 2015

Basin Ask: $395,000

State Ask: $152,000

BIP webpage

Routt County Conservation District " YWG BRT Phase II Agricultural Needs/Return Flow Preliminary Assessment Project"

In this project the Routt County Conservation District contracted with CSU to conduct a reconnaissance and scoping effort.  The objectives were to evaluate the need for and to define the nature of a project aimed at assessing the impact of current and altered irrigation practices on irrigation return flows and related groundwater conditions in Colorado’s Yampa and White River Basins.

Approved: July, 2015

Basin Ask: $13,250

Reports

 

Community Agriculture Alliance "Yampa-White-Green Education and Outreach 2020"

The Community Agriculture Alliance (CAA) request additional WSRF funds to continue the Public Education Participation Outreach work it has been doing for the Yampa-White-Green Basin Roundtable since 2016.   The task preformed by the CAA would be continued social media (website/Facebook) development and support, print and radio ads in regional newspapers and stations, and continue to develop and sponsor regional water events.  The amount requested would cover a three year span, after the initial education and outreach grant was competed.

Approved: July, 2020

Basin Ask: $99,000

Application                              Report

Nick Charchalis "Drescher Dam Rehabilitation"

The Drescher Dam located approximately 2.5 miles from the Yampa River in the Breeze Basin approximately 9 miles Southwest of Craig.  This grant is will support the phase 1 repair of the dam.  Phase 1 will consist of engineering phase 1 and 2 repairs and immediate risk reduction measure of 1) mitigation of rodent burrows in the embankment, 2)riprap of the emergency spillway transport section, 3)development of reservoir control plan.

Approved: July 2020

Basin Ask: $10,000

Application                                      Reports

Trout Unlimited "Lower Elkhead Creek Restoration Project, Phase 1"

The Trout Unlimited  project of Lower Elkhead Creek (downstream of Elkhead Reservoir) will address the creek  significant bank erosion,  channel incision, fragmentation and reduction of the riparian corridor, and general habitat  degradation. Private landowners have been actively seeking solutions to improve the creek’s  ecosystem and maintain agricultural ways of life. The proposed Lower Elkhead Creek Restoration  Project, Phase 1, aims to address landowners’ concerns by restoring more than 50 acres of riverine  and riparian habitat, which will help to a) stabilize the creek channel, b) increase resiliency to flooding,  drought and human activity, c) provide tangible benefits to local agriculture and wildlife, and d)  improve water temperature and water quality. Trout Unlimited (TU) will partner with private  landowners, community groups, NGOs and state and federal agencies to restore the riparian corridor  along Elkhead Creek, utilizing measures such as bank regrading, structural bank reinforcement,  strategic plantings of native riparian species and adjusted land management.

Approved: March 2020

Basin Ask: $50,000                        State Ask: $150,000

 YWG BRT Application                                       Reports

Upper Yampa Water Conservancy District "Diversion Infrastructure Improvement Project"

This is a two year pilot project. The goal is to fund twenty (20) Tier 1 and ten (10) Tier 2 infrastructure  improvement projects in the basin, resulting in the installation of properly functioning headgates and  measuring devices. This will benefit diverters that have water rights by protecting their overall water  security in the future. This will benefit the Y/W/G Basin Roundtable (BRT) by reducing the number of  smaller grant applicants.

The Upper Yampa Water Conservancy District  propose a grant program  that will encourage the improvement of infrastructure and help to ensure that the projects are matched  with the right funding source based on size and complexity. It is estimated that there could be more  than 800 diversions without measuring devices within the Upper Yampa Water Conservancy District’s  boundaries. Many of these have diversion infrastructure in need of improvement. These diversions  could be redesigned to replace aging infrastructure, help ensure water delivery, and improve fish  passage and habitat.

Approved: January 2020

Basin Ask: $100,000

YWG BRT Application                                       Reports

Yampatika "Yampa White Green Rivers K-12 Curriculum"

Yampatika will develop and implement a K-12 focused youth water education program for the Yampa/White/Green (YWG) Basin Roundtable. This project will include the development of curriculum based on Next Generation Science Standards (NGSS) state standards, a comprehensive evaluation system that measures both quantitative and qualitative success and professional development opportunities for educators related to water education. Youth water education programs will focus on increasing general water education, which includes highlighting the importance of water in the Basin to all relevant stakeholders including agriculture, municipalities, recreation, businesses, community members, and the environment. These education programs will be a valuable opportunity to highlight the Colorado Water Plan, the Basin Implementation Plan, and the critical role of the YWG Basin Roundtable to address the consumptive and non-consumptive water needs across the Basin. Evaluation components will be created for school-based programs and professional development opportunities to ensure short and long-term success of water education programs. WSRF funds will be used over a three-year period to accomplish these educational objectives.

Approved: November, 2019

Basin Ask: $99,053

 YWG BRT Application                                       Reports

The Nature Conservancy "Maybell Ditch Diversion Structure and Headgate Rehabilitation Study"

The Maybell Ditch will consult with an engineer to create a final engineering design and construction plans to improve the diversion structure and replace the headgate on the Maybell Ditch. Once installed, the modern headgate will allow irrigators to better control the volume of water diverted from the Yampa. This will improve flows for nonconsumptive users along 18 miles of the Yampa, as well as improve delivery for Maybell irrigators.

Approved: May, 2019

Basin Ask: $73,000

Application                               Reports

Colorado River District "Yampa River Basin Integrated Water Management Plan (IWMP)"

The goal of this project is to build consensus, through hydrologic modeling scenarios, among various stakeholders on the projects/methods that can advance the Basin Implementation Plan.  The Colorado River District is the fiscal agent but the Yampa-White-Green Basin Roundtable is the project owner.

Approved: March, 2019

Basin Ask: $154,524

YWG Application                                                           Reports                                          Website